Ability to plan assign and track mitigation plans through out the risk lifecycle.Ability to integrate schedule with mitigation plans
Ability to assess mitigation plan effectiveness vs planned.
Ability to run a JCL on detailed IMS using both resource rates and or fixed costs as well as analysis on IMS eliminates need to generate a summary model