Joint Confidence Level

Ability to run a JCL on detailed IMS using both resource rates and or fixed costs as well as analysis on IMS eliminates need to generate a summary model

Part Of:

Ability to run a JCL on detailed IMS using both resource rates and or fixed costs.Analysis on IMS eliminates need to generate a summary model.

Key Features

  • Import cost and resource loaded  P6 (*.xer), MSP (xml), MPX, and IMPDAR (Proteus) schedules
  • Run integrated cost and schedule risk analysis including resource (time dependent) and fixed (time independent) costs.
  • Joint Confidence Level plots for the Project and all activities in the schedule including milestones or summary activities.
  • Up to 10 user defined confidence levels can be plotted
  • Results for each plot line can be saved to csc file
  • Four quadrants as a % of meeting or over budget or schedule can be viewed for each iteration  or specific cost, duration, or finish time